Customer: NextEra Energy
Address: 6610 Nuclear Rd, Two Rivers, WI 54241
POC: Sean Edwards, Senior Nuclear Project Coordinator
Phone: 920-755-7364
Email: [email protected]
Website: http://www.nexteraenergy.com
Contract Type: Commercial Nuclear Plant (non-GSA)
Plant Details:
Location: Two Rivers, WI (13 miles NNW of Manitowoc)
Operator: NextEra Energy Point Beach, LLC
Reactor Type: Pressurized Water Reactor
Electrical Output: 512 MWe
Reactor Vendor/Type: Westinghouse Two-Loop
Containment Type: Dry, Ambient Pressure
Services Provided:
I&C planner with PMO Optimization Project
Organized I&C Model Work Orders, PMID, RQs for CRIT CAT 001 to 003 equipment
Used PassPort/Portal J v10 and Asset Suite
Identified work orders and scheduled operational tasks for Safety Shutdown Systems, Loop Calibrations, and Protective Relays
Created equipment lists for work including ordered parts, written instruction, processes, tag outs, RWPs, Engineering support
Applied 10CFR50.59 and 10CFR50.65 (Maintenance Rule)
Assigned correct schedule grade adherence
Identified level of planning (preventive, minor, corrective, elective, modifications)
Wrote CAP A/Rs, PMCRs, PCRs